RP-MSP Update 59, IPSR-6

RP-MSP: I was sick a majority of the week, so I will talk about what I did over the weekend. On Sunday I came in to do a static waterproofing test....

RP-MSP Weekly Update 16

This week was a huge success for the A/V data collecting system. We attached the underwater camera to the nacelle and we had all of the LAN camera se...

RP-MSP Update 58, IPSR-5

RP-MSP: Today we did not work on much, since we had completed everything, other than discuss potential dates for testing the video system in the po...

RP-MSP Update 57

As soon as I entered the monitoring lab today I instantly began working on the boat. I attached the camera to the velcro on the motor nacelle and I t...

RP-MSP Update 56, IPSR-4

RP-MSP: Today, I didn't do much. I discussed the options that we had for attaching certain cameras to the boat. Firstly, I suggested that we use th...

RP-MSP Update 55, IPSR-3

RP-MSP: Today I made my attempt at connecting everything together, including the camera and the video server. We accessed it and everything worked ...

RP-MSP Update 54, IPSR-2

RP-MSP: Today I attached the access point and the video server. Everything seems to be working perfectly. I did have an issue of not being able to ...

RP-MSP Update 53, IPSR-1

Today I completed the new electronics system for the craft, all we needed to do was connect to main terminal to the battery and connect the servo to ...

RP-MSP Weekly Update 15

Since we didn't have the chance to come to class on Tuesday, we had a short week to work on the project. Overall, this entire week contained me wor...

RP-MSP Update 52

Today I worked thoroughly on the electronics system. Firstly, I found screws that fit perfectly into the phidgets boards. Therefore I was able to ...

RP-MSP Update 51

Today I started on the gut-and-cut process of the electronics system. We are doing this for two main reasons: 1. It looks very messy, and 5 ft wiri...

RP-MSP Update 50

Today was senior service day, but I did come in over the weekend so I will talk about that. The most recent Sunday I came in with my brother to s...

RP-MSP Weekly Update 14

This week, I did quite a bit: On Tuesday, I discovered that we would be using an ROV video camera for the feed instead of GoPros. This allowed us t...

RP-MSP Update 49

Today was packed full of things to do. First, we opened the class doing a task for Dr. Bill by connecting the speaker system in Mr. H's lab so the ...

RP-MSP Update 48

Today we had more visitors and I was able to create a showcase video to present my project. The video outlines our navigation test, however it is onl...

RP-MSP Update 47

Today, we spliced into the ROV video camera's power wiring so that we could connect it to the iBoat. In addition to this, I e-mailed Dr. Bill for a r...

RP-MSP Weekly Update 13

This week we made progress with the video electronics system, as well as an easier way to use the navigation system. Video: We concluded that we ar...

RP-MSP Update 46

We did not work on the boat today, since we are in need of ordering the final components. However, summer interns from Cornell came over for a tour o...

RP-MSP Update 45

Today we logged on to the camera live feed server, and we set up the resolution and compression for a camera to get familiar with the website. Conclu...

RP-MSP Update 44

Today we opened class with a discussion on our hardware for capturing the necessary A/V. I then divulged into a conversation about my outside of sc...