Tags

    9/20/17

    Today Daniel and I continued to do some work on the drone. He had previously made a pencil mark on the top of the frame because there needed to be one additional hole to attach the power distribution board. We looked around the Energy Lab for a while looking for a drill, but didn't find anything useful. Just when we were about to give up, though, Daniel found a Dremel tool with a drill bit, so we were able to attach the distribution board after all. After that, we went to go watch Ilan flying the drone inside the ELab. He actually spent a good amount of time flying the drone and got a ton of pictures for Zoe and Pikoi's model. They have been working really hard lately on getting that done and it is really coming along.

    Comments