This week was a huge success for the A/V data collecting system. We attached the underwater camera to the nacelle and we had all of the LAN camera se...
Since we didn't have the chance to come to class on Tuesday, we had a short week to work on the project.
Overall, this entire week contained me wor...
This week, I did quite a bit:
On Tuesday, I discovered that we would be using an ROV video camera for the feed instead of GoPros. This allowed us t...
This week we made progress with the video electronics system, as well as an easier way to use the navigation system.
Video: We concluded that we ar...
https://www.youtube.com/watch?v=bMOuxZ2ONVM&feature=youtu.be
This week was mostly preparation for the friday pool test.
On friday, we were able to navigate half of the pool, accomplishing several figure-8's, ...
Today we didn't do much other than discuss slight waterproofing details.
This week we made slight adjustments to the circuitry of the boat to decre...
This week we finished attaching the case to the craft, and we diagnosed and fixed the wiring of the craft. There is still a dirty connection in consi...
This week we have made a huge step towards the completion of our boat. Everything is fully functional and hopefully next week we can strap everything...
This week we made a bunch of progress:
We started the week out strong by accomplishing the navigation assembly with the attachment of the gears and...
Today, I met the person who assembled the first generation of the iBoat project, and we exchanged conversation about how the iBoat worked. Our indivi...
Today I finished the power point presentation for tomorrow, so that is the basic summary for what happened so far.
We also had visitors from the mi...
This week was the first week of a new quarter so it started out slow. We did not do much, other than planning for our presentation on Friday the 16th...
https://www.youtube.com/watch?v=9tOQBxvTH44
This week we did a lot of circuit work, including a full system setup for the motor and steering control, and a mapping of that connection. We also d...
I worked on the diagram today
[Screen Shot 2014-11-13 at 11.14.11 AM.png]
*the base station diagram is not included
I will continue this next w...
This week was mostly planning. We configured the pelican cases to determine which size we could use, and we were asked several questions from the sch...
Week of Halloween:
This week, we set-up and tested all of our various phigdets, servos, and servo controllers available to us. We have recorded vid...