Week 9 10/10-10/17

Alohikea- This week was a very tricky week because our classes were cut down short due to parent teacher week. What we did was catch up on so...

Week 8 10/2-10/9

Alohikea- We saw that out wiring was a it faulty and needed bigger wires to handle the power of the battery. We planned to use a switch to he...

Week 7 Quarter 4 5/8/17-5/12/17

Alohikea- This week we finally started to get our hand on the project. After a very busy week with a lot of extra things we needed to do, we...

Week 7 9/26-10/1

Elijah- During the duration of this week we really focused on the first steps of creating this robot. This meant the design and aspects of the rob...

Week 7 2/21/17-2/25/17

Alohikea- This week we saw a lot of problems with our wiring. We ended up needing to re do all of it but we don't have enough wire to do so....

Week 6 Quarter 4 4/30/17-5/6/17

Alohikea- This week we had a few setbacks being a speaker came in but it was very interesting and my partner was gone due to sporting events. I d...

Week 6 9/18-9/25

This is placeholder text for your new blog entry. Replace it with your own. Alohikea- This week we had a lot of good work ideas. We started look...

Week 6 2/14/17-2/18/17

Alohikea- This week we didn't have much time due to a short week but what we did was a lot of paperwork and future planning. We started to ma...

Week 5 Quarter 4 4/25/17-4/29/17

Alohikea- This week we did our interviews. I had mine and it was fun and intense. I definitely could have been more prepared for it and I wi...

Week 5 9/10-9/17

-Elijah During the course of this past week we have been catching up on our deliverables for this class. I understand the need for them but i am not a...

Week 5 2/7/2017-2/12/2017

Alohikea- This week we focused on making our wiring nice. We went over each component looking to make sure none of the connections were faul...

Week 4 Summary 9/3-9/9

-Elijah This week we did not have a lot of hands on work. we focused mostly on how Asana and management stuff. Im not a big "paperwork type of person...

Week 4 Quarter 4 4/16/17-4/24/17

Alohikea- For this past week, we didn't do much on our project because we got busy with our career prep. We focused more on that and getting...

Week 4 1/31/17-2/5/17

Alohikea- During this week we started to put everything back into the box. We started getting the final touches and now we are just planning ...

Week 3 Summary 8/29-9/2

This week we did a lot of Project management building skills. We went through a video and the process its took to create that video. The amount of pr...

Week 3 Quarter 4 4/9/17-4/15/17

Alohikea- This week we did not do as much as we wanted to do. I missed a few classes and my partner missed one and we both were not there. W...

Week 3 1/25/17-1/29/17

Alohikea- This week we tackled the pneumatic solenoid system and finally got it to work. We found out how to power the solenoid and make it f...

Week 2 Quarter 4 4/2/17-4/8/17

Alohikea- This week finished wiring soldering the connections for the compressors and started and almost completed the wiring for the soleno...

Week 2 Blog

This week Me and my partner Alohakea did a lot of research on how to work pneumatics, best designs for the system and other people design for a can c...

Week 2 1/15/17-1/22/17

Alohikea- This week we did a lot, Elijah worked on the box for our prototype. He made a lot of progress in making the structure to hold the p...